SLP's integrated deck construction capability ranges from up to 10,000 tonnes and down to 100 tonnes for a minimum facility platform deck.

As with a self contained module, integrated decks leaving SLP's facilities are commissioned to the maximum extent possible. Care is taken within SLP's pre-fabrication workshops to ensure that prior to coating, support for piping and cable trays for example, are installed to minimise remedial work on site.

SLP directly employs tradesmen such as welders, platers, pipefitters, mechanical fitters, electrical and instrumentation technicians to ensure the highest standards or workmanship.